Kernkraftwerke in Deutschland — reactor-level list of nuclear power plant units from the GeoNuclearData database (WNA/IAEA-sourced), including shutdown and under-construction units with reactor type/model, construction and operational dates, and capacity (MW). Complements the power-plants datasets (which cover operating plants of all fuels, plant-level): this list is reactor-unit level and includes historical (shutdown) and future (under construction) units. Names are ASCII/English as published by the source; native-script names not in source. Snapshot at source commit date (2024-era database; per-record LastUpdatedAt varies). Enthält 37 Datensätze. Download in Excel, CSV, PDF.
📥 Kostenloser Download
💡 Wichtige Punkte
- Enthält 37 Datensätze / 12 Felder
- Kostenlos verfügbar in Excel, CSV und PDF
- Datenquelle: open data
📋 ข้อมูลทั้งหมด
Angezeigt 37
von 37
| Name | Latitude | Longitude | Status | Reactor Type | Reactor Model | Construction Start | Operational From | Operational To | Capacity Mw | Iaea Id | Data Source |
|---|---|---|---|---|---|---|---|---|---|---|---|
| AVR Juelich | 50.903 | 6.421 | Shutdown | HTGR | Pebble bed reactor prototype | 1961-08-01 | 1969-05-19 | 1988-12-31 | 13 | 114 | WNA/IAEA |
| Biblis-A | 49.709 | 8.415 | Shutdown | PWR | PWR | 1970-01-01 | 1975-02-26 | 2011-08-06 | 1146 | 85 | WNA/IAEA |
| Biblis-B | 49.709 | 8.415 | Shutdown | PWR | PWR | 1972-02-01 | 1977-01-31 | 2011-08-06 | 1178 | 91 | WNA/IAEA |
| Brokdorf | 53.85 | 9.345 | Shutdown | PWR | PWR | 1976-01-01 | 1986-12-22 | 2021-12-31 | 1307 | 107 | WNA/IAEA |
| Brunsbuettel | 53.891 | 9.202 | Shutdown | BWR | BWR-69 | 1970-04-15 | 1977-02-09 | 2011-08-06 | 770 | 86 | WNA/IAEA |
| Emsland | 52.471 | 7.322 | Shutdown | PWR | Konvoi | 1982-08-10 | 1988-06-20 | 2023-04-15 | 1242 | 108 | WNA/IAEA |
| Grafenrheinfeld | 49.984 | 10.186 | Shutdown | PWR | PWR | 1975-01-01 | 1982-06-17 | 2015-06-27 | 1225 | 97 | WNA/IAEA |
| Greifswald-1 | 54.143 | 13.668 | Shutdown | PWR | VVER V-230 | 1970-03-01 | 1974-07-12 | 1990-12-18 | 440 | 123 | WNA/IAEA |
| Greifswald-2 | 54.143 | 13.668 | Shutdown | PWR | VVER V-230 | 1970-03-01 | 1975-04-16 | 1990-02-14 | 408 | 124 | WNA/IAEA |
| Greifswald-3 | 54.143 | 13.668 | Shutdown | PWR | VVER V-230 | 1972-04-01 | 1978-05-01 | 1990-02-28 | 408 | 125 | WNA/IAEA |
| Greifswald-4 | 54.143 | 13.668 | Shutdown | PWR | VVER V-230 | 1972-04-01 | 1979-11-01 | 1990-06-02 | 408 | 126 | WNA/IAEA |
| Greifswald-5 | 54.143 | 13.668 | Shutdown | PWR | VVER V-213 | 1976-12-01 | 1989-11-01 | 1989-11-24 | 408 | 127 | WNA/IAEA |
| Grohnde | 52.033 | 9.412 | Shutdown | PWR | PWR | 1976-06-01 | 1985-02-01 | 2021-12-31 | 1289 | 101 | WNA/IAEA |
| Grosswelzheim | 50.055 | 8.985 | Decommissioning Completed | BWR | Superheated steam reactor | 1965-01-01 | 1971-07-20 | 23 | 134 | WNA/IAEA | |
| Gundremmingen-A | 48.513 | 10.401 | Shutdown | BWR | 1962-12-12 | 1967-04-12 | 1977-01-13 | 237 | 104 | WNA/IAEA | |
| Gundremmingen-B | 48.513 | 10.401 | Shutdown | BWR | BWR-72 | 1976-07-20 | 1984-07-19 | 2017-12-31 | 1244 | 100 | WNA/IAEA |
| Gundremmingen-C | 48.513 | 10.401 | Shutdown | BWR | BWR-72 | 1976-07-20 | 1985-01-18 | 2021-12-31 | 1249 | 102 | WNA/IAEA |
| Isar-1 | 48.607 | 12.296 | Shutdown | BWR | BWR-69 | 1972-05-01 | 1979-03-21 | 2011-08-06 | 870 | 89 | WNA/IAEA |
| Isar-2 | 48.607 | 12.296 | Shutdown | PWR | Konvoi | 1982-09-15 | 1988-04-09 | 2023-04-15 | 1285 | 106 | WNA/IAEA |
| KNK-II | 49.098 | 8.441 | Shutdown | FBR | Prototype | 1974-09-01 | 1979-03-03 | 1991-08-23 | 18 | 135 | WNA/IAEA |
| Kahl | 50.059 | 8.987 | Decommissioning Completed | BWR | BWR | 1958-07-01 | 1985-11-25 | 15 | 82 | WNA/IAEA | |
| Kruemmel | 53.41 | 10.41 | Shutdown | BWR | BWR-69 | 1974-04-05 | 1984-03-28 | 2011-08-06 | 1260 | 94 | WNA/IAEA |
| Lingen | 52.483 | 7.302 | Shutdown | BWR | BWR with fossil fuel-fired superheater | 1964-10-01 | 1968-10-01 | 1977-01-05 | 183 | 133 | WNA/IAEA |
| MZFR | 49.104 | 8.432 | Shutdown | PHWR | 1961-12-01 | 1966-12-19 | 1984-05-03 | 50 | 93 | WNA/IAEA | |
| Muelheim-Kaerlich | 50.409 | 7.485 | Shutdown | PWR | PWR | 1975-01-15 | 1987-08-18 | 1988-09-09 | 1219 | 96 | WNA/IAEA |
| Neckarwestheim-1 | 49.039 | 9.176 | Shutdown | PWR | PWR | 1972-02-01 | 1976-12-01 | 2011-08-06 | 805 | 88 | WNA/IAEA |
| Neckarwestheim-2 | 49.039 | 9.176 | Shutdown | PWR | Konvoi | 1982-11-09 | 1989-04-15 | 2023-04-15 | 1225 | 119 | WNA/IAEA |
| Niederaichbach | 48.604 | 12.304 | Decommissioning Completed | HWGCR | pressure tube reactor | 1966-06-01 | 1974-07-31 | 100 | 84 | WNA/IAEA | |
| Obrigheim | 49.365 | 9.077 | Shutdown | PWR | 1965-03-15 | 1969-03-31 | 2005-05-11 | 283 | 121 | WNA/IAEA | |
| Philippsburg-1 | 49.253 | 8.432 | Shutdown | BWR | BWR-69 | 1970-10-01 | 1980-03-26 | 2011-08-06 | 864 | 87 | WNA/IAEA |
| Philippsburg-2 | 49.253 | 8.432 | Shutdown | PWR | PWR | 1977-07-07 | 1985-04-18 | 2019-12-31 | 1268 | 98 | WNA/IAEA |
| Rheinsberg | 53.147 | 12.991 | Shutdown | PWR | VVER-70 | 1960-01-01 | 1966-10-11 | 1990-06-01 | 62 | 122 | WNA/IAEA |
| SNR-300 (Kalkar) | 51.763056 | 6.326944 | Never Commissioned | FBR | SNR-300 | 1973-04-23 | 295 | IAEA/Wikipedia | |||
| Stade | 53.62 | 9.53 | Shutdown | PWR | 1967-12-01 | 1972-05-19 | 2003-11-14 | 630 | 83 | WNA/IAEA | |
| THTR-300 | 51.68 | 7.972 | Shutdown | HTGR | Pebble bed reactor | 1971-05-03 | 1987-06-01 | 1988-09-29 | 296 | 92 | WNA/IAEA |
| Unterweser | 53.429 | 8.477 | Shutdown | PWR | PWR | 1972-07-01 | 1979-09-06 | 2011-08-06 | 1230 | 90 | WNA/IAEA |
| Wuergassen | 51.639 | 9.393 | Shutdown | BWR | 1968-01-26 | 1975-11-11 | 1994-08-26 | 640 | 136 | WNA/IAEA |