💡 Key Takeaways

  • Contains 178 records with 16 fields
  • Available for free download in Excel, CSV, and PDF formats
  • Data sourced from https://github.com/wri/global-power-plant-database

📋 ข้อมูลทั้งหมด

Showing 178 of 178
Name Gppd Idnr Capacity Mw Latitude Longitude Primary Fuel Other Fuels Commissioning Year Owner Source Url Geolocation Source Year Of Capacity Data Generation Gwh Estimated Generation Gwh Generation Data Source
PLTU Paiton I Unit 7 & 8WRI10009415355-7.7184113.5827CoalPT. Paiton Energy CorpIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 29141.78
PLTU SuralayaWRI10009823400-5.892106.03CoalPLN -.PT Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 18502.72
PLTGU GresikWRI10008761579-7.1633112.6615GasPLN – Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 6579.26
PLTU Tanjung Jati B - expansionWRI10009911324-6.446110.7423CoalPT. Central Java Power (EPC : Korea Midland Power Co)Indonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 7205.17
PLTU Tanjung Jati BWRI10009901320-6.446110.7423CoalPT. Central Java PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 7183.4
Cilacap Sumber power stationWRI10758041260-7.6832109.0964Coal2011Sumber Segara PrimadayaGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 6856.89
PLTGU Priok Block 1 2WRI10008851180-6.1102106.8671GasPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 4916.73
PLTU Jabar Selatan - Pelabuhan RatuWRI10009381050-7.0242106.5464CoalPLNIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 5714.07
PLTGU Tambak LorokWRI10008871034-6.9505110.434GasPLN – Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 4308.39
CirataI & IIWRI10007481008-6.7004107.3671HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 3426.09; 2014: 2354.32; 2015: 3099.69; 2016: 3272.44; 2017: 3205.36
PLTU Jawa Barat - IndramayuWRI1000939990-6.2747107.9704CoalPLN + China National Electric Engineering Co. Ltd. (CNEEC)Indonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 5387.55
PLTU Banten 3 - Teluk Naga/LontarWRI1000916945-6.0585106.4646CoalPLN + Dongfang Electrik Corp PT Dalle EnergyIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 5142.66
PLTGU Muara Tawar Block 1 &2WRI1000882920-6.0867106.9987GasPT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 3833.39
PLTGU CilegonWRI1000874903-5.9306106.1042GasPLN Cilegon Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 3762.55
PLTGU Belawan – SicanangWRI10008718173.771598.6687GasPLN / KITSUMBAGUTIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 3404.21
Perawang Mill power stationWRI10758147550.6893101.6191Coal2009PT Indah Kiat Pulp & PaperGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 4108.69
PLTGU Muara Karang repoweringWRI1000880753-6.1087106.7877GasPLN – Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 3137.54
SagulingWRI1001005700.72-6.9126107.3663HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2013: 2110.52; 2014: 1512.59; 2015: 2024.74; 2016: 2178.25; 2017: 2110.52
Tanjung Awar-Awar power stationWRI1075817700-6.8105111.9955Coal2012PT PLN PerseroGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 3809.38
Banten Serang power stationWRI1075800660-5.883106.0459Coal2017PT Lestari Baten Energi (LBE)GCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 3591.7
PLTU CirebonWRI1000921660-6.7704108.6151CoalPT. Cirebon Electric PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 3591.7
PLTU Jawa Tengah 1 - RembangWRI1000940630-6.636111.4749CoalPLN(EPC : Zeland-Priamanaya-Tronoh)Indonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 3428.44
Pacitan power stationWRI1075812630-8.2578111.3736Coal2011PT PLN PerseroGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 3428.44
PLTU Banten 1 - Suralaya unit 8WRI1000914625-6.0585106.4646CoalPLN -.PT Indonesia Power - 2010Indonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 3401.23
PLTU Banten 2 - LabuhanWRI1000915600-6.3919105.8288CoalPLN / 2010Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 3265.18
PLTU Cilacap 1 & 2WRI1000920600-7.7513109.0186CoalPT. Sumber Segara PrimadayaIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 3265.18
PLTU GresikWRI1000929600-7.1633112.6615CoalPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 3265.18
PLTGU Muara Karang Block IWRI1000879509-6.1087106.7877GasPLN – Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 2120.86
PLTGU GratiWRI1000875461-7.6517113.0244GasPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1920.86
PLTG Muara Tawar B-3WRI1000836420-6.0867106.9987GasPT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1750.02
PLTG Muara Tawar Block 4WRI1000837420-6.0867106.9987GasPT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1750.02
PLTGU Krakatau Daya Listrik (KDL)WRI1000878400-5.9924105.9849GasPT. Krakatau Daya ListrikIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1666.69
PLTU Muara KarangWRI1000954400-6.1069106.7882CoalPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 2176.79
PLTU Pangkalan Susu 1 & 2WRI10009674004.119698.2555CoalPLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi)Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 2176.79
PLTGU Muara Tawar Block 5WRI1000883384-6.0867106.9987GasPT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1600.02
Celukan Bawang power stationWRI1075802381-8.1963114.8516Coal2015PT General Energy BaliGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 2073.39
Gunung SalakWRI1000759375-6.7416106.648GeothermalPT. Chevron Geothermal Salak LtdIndonesia Power Generationhttps://repit.wordpress.com/WRI
Tangga (asahan II)WRI10010243172.547999.3028HydroPT. Indonesia Asahan aluminiumIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 965; 2014: 682.53; 2015: 822.52; 2016: 886.87; 2017: 926.6
PLTG GratiWRI1000829302-7.6517113.0244GasPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1258.35
North Duri Cogeneration PlantWRI10007943001.3722101.226GasPT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron)Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1250.01
PLTU Tambak LorokWRI1000984300-6.9507110.4304CoalPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1632.59
Sigura gura (asahan II)WRI10010142862.519699.2793HydroPT. Indonesia Asahan aluminiumIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 870.63; 2014: 615.78; 2015: 742.08; 2016: 800.14; 2017: 835.99
Cikarang Babelan power stationWRI1075803280-6.1161107.052Coal2017PT Cikarang ListrindoGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 1523.75
Sulawesi Mining power stationWRI1075816280-2.8274122.1553Coal2016Sulawesi Mining InvestmentGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 1523.75
Keban Agung power stationWRI1075807270-3.7515103.6481Coal2015PT Primanaya EnergiGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 1469.33
PLTG BelawanWRI10008172603.583398.6667GasPLN / KITSUMBAGUTIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 1083.34
PLTU Asam-asam 1 & 2WRI1000910260-3.9253115.1043CoalPLN - South Kalimantan Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1414.91
PLTU Tanjung Enim -Bukit AsamWRI1000988260-3.7316103.7975CoalPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1414.91
PLTU -Jeneponto I & IIWRI1000907250-5.6184119.5506CoalPT Bosowa EnergyIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1360.49
PLTU Labuhan AnginWRI10009482301.717698.7265CoalPLN - North Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 1251.65
PLTU Simpang BelimbingWRI1000978227-3.4104.1158CoalPT. Guo Hua Energy Musi MakmurIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1235.32
Wayang WinduWRI1001044227-7.1966107.6258GeothermalPT. Star EnergyIndonesia Power Generationhttps://repit.wordpress.com/WRI
Kaltim Teluk Balikpapan power stationWRI1075806220-1.1704116.7887Coal2015PLNGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 1197.23
PLTU Banjarsari/Merapi Timur-LahatWRI1000913220-3.7241103.6894CoalPT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%)Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1197.23
PLTU NAD-Nagan RayaWRI10009562204.108996.1972CoalPLN (EPC : Sinohydro Co. Ltd)Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1197.23
Pekanbaru Tenayan power stationWRI10758132200.5644101.5234Coal2016PT PLN PerseroGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 1197.23
MusiWRI1000792215.475-3.766102.435HydroPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/GEODB2013: 561.45; 2014: 422.24; 2015: 513.22; 2016: 571.75; 2017: 588.43
Darajat 2 3WRI1000751215-7.2173107.7394GeothermalPT. Chevron Geothermal Darajat LtdIndonesia Power Generationhttps://repit.wordpress.com/WRI
PLTGU Muara Karang repowering Blok 2WRI1000881210-6.1087106.7877GasPLN – Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 875.01
Lampung Sebalang power stationWRI1075809200-5.5859105.3872Coal2015PT PLN PerseroGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 1088.39
PLTG Krakatau Posco EnergyWRI1000835200-6.0048105.9961GasPT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%))Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 833.34
PLTU KaurWRI1000943200-2.5213121.357CoalPLNIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 1088.39
PLTU Ombilin - Sijantang - SawahluntoWRI1000960200-0.6094100.7535CoalPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 1088.39
PLTU Tarahan # 1 2WRI1000994200-5.518105.35CoalIndonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1088.39
PLTU Tarahan 3 & 4 - SebalangWRI1000995200-5.518105.35CoalPLNIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 1088.39
Amamapare Port power stationWRI1075798195-4.8278136.8391Coal1998PT Puncakjaya PowerGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 1061.18
JatiluhurWRI1000762186-6.523107.389HydroPerum Jasa Tirta IIIndonesia Power Generationhttps://repit.wordpress.com/GEODB2013: 670.77; 2014: 452.3; 2015: 524.85; 2016: 671.81; 2017: 664.17
PB. Sudirman/MricaWRI1000800180.9-7.3927109.6054HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/GEODB2013: 574.49; 2014: 398.71; 2015: 459.9; 2016: 565.77; 2017: 567.57
Asahan IWRI10007371802.511399.259HydroPT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%)Indonesia Power Generationhttps://repit.wordpress.com/WRI2013: 614.23; 2014: 443.82; 2015: 523.3; 2016: 555.94; 2017: 592.43
PLTG Sengkang/WajoWRI1000849180-5.14119.4221GasPT. Energy SengkangIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 750.01
SingkarakWRI1001017175-0.6909100.6034HydroPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 551.31; 2014: 462.3; 2015: 484.64; 2016: 533.52; 2017: 559.21
LaronaWRI1000780165-2.8194121.5783HydroPT. IncoIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 487.39; 2014: 423.65; 2015: 445.46; 2016: 510.49; 2017: 460.54
PLTG Cikarang ListrindoWRI1000821150-6.1133106.7788GasPT. Cikarang ListrindoIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 625
PLTG KeramasanWRI1000833145-2.9167104.7458GasPT Asta Keramasan Energy (AKE)Indonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 604.17
Kamojang 1 2 3WRI1000764140-6.4239107.4553GeothermalPLN – Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA
PLTGU Sengkang/WajoWRI1000886135-5.14119.4221GasPT. Energy SengkangIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 562.5
PLTG GilimanukWRI1000825133-8.1716114.4344GasPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 554.17
BalambanoWRI1000739130-2.5213121.357HydroPT. IncoIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 338.09; 2014: 252.07; 2015: 306.96; 2016: 344.3; 2017: 354.37
PLTGU Bekasi PowerWRI1000870130-6.2611107.1528GasPT. Bekasi Power/PT. Kawasan Industri Jababeka TbkIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 541.67
BakaruWRI1000738126-3.1141119.6042HydroPLN-South&South East Sulawesi Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 423.6; 2014: 334.58; 2015: 350.67; 2016: 415.34; 2017: 424.69
Batu Hijau power stationWRI1075801124-8.9012116.7382Coal1999Pt Newmont Nusa TenggaraGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 674.8
Maninjau IIIWRI1000785123-0.2923100.152HydroPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 319.89; 2014: 238.5; 2015: 290.43; 2016: 325.76; 2017: 335.29
PLTG TelloWRI1000859123-5.14119.4221GasPLN-South&South East Sulawesi Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 512.5
PLTG PesanggaranWRI1000845122-8.7157115.214GasPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 508.34
Kalteng-1 Pulang Pisau power stationWRI1075805120-2.8226114.2088Coal2015PT PLN PerseroGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 653.03
Merak power stationWRI1075811120-5.884106.0642Coal2014PT Merak EnergiGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 653.03
Koto Panjang KamparWRI10007751140.2905100.8814HydroPLNIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 419.08; 2014: 310.21; 2015: 359.57; 2016: 397.38; 2017: 420.15
PLTU Sumbar - Teluk sirih Unit 1WRI1000980112-1.0772100.3727CoalPLN (EPC: CNTIC (China National Tecnical Import Corporation))Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 609.5
PLTU Tanjung KasamWRI10009921101.0455104.133CoalPT. Tanjung Kasam Power Batam (PT. TJK Power)Indonesia Power Generationhttps://repit.wordpress.com/WRI2017: 598.61
Ulubelu 1 & 2WRI1001040110-5.3096104.5733GeothermalPT. PLNIndonesia Power Generationhttps://repit.wordpress.com/WRI
PLTG Belawan TTFWRI10008181053.583398.6667GasPLN / KITSUMBAGUTIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 437.5
Sutami / Karangkates - BrantasWRI1001021105-8.1606112.4443HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 371.79; 2014: 266.78; 2015: 301.33; 2016: 387.04; 2017: 371.86
PLTU PerakWRI1000970100-7.2492112.7508CoalPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 544.19
PLTU Priok 3 & 4WRI1000972100-6.1071106.8716CoalPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 544.19
PLTU Sulawesi Selatan - Barru/FTP1WRI1000979100-4.2931119.6326CoalPLN-South&South East Sulawesi Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 544.19
PLTG PemaronWRI100084497-8.1189115.0887GasPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 404.17
Besai - Way KananWRI100074492.8-4.9822104.8051HydroPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 268.15; 2014: 244.77; 2015: 253.6; 2016: 273.52; 2017: 280.63
Lau RenunWRI1000781823.082498.065HydroPLN - Pandan SectorIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 281.58; 2014: 231.76; 2015: 248.79; 2016: 271.47; 2017: 271.06
Ketapang Smelter power stationWRI107580880-2.3662110.1573Coal2016PT Well Harvest Winning Alumina RefineryGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 435.35
Lahendong IVWRI1000778801.2542124.8225GeothermalPLN + Pertamina Geothermal EnergyIndonesia Power Generationhttps://repit.wordpress.com/WRI
PLTG GresikWRI100083080-7.1633112.6615GasPLN – Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 333.33
PLTG Sunyaragi 1 2 3 4WRI100085580-7.4064109.5842GasPLN – Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 333.33
PesanggaranWRI100080375.78-8.7157115.214OilINDONESIA POWER UNITIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 136.79
Pesanggaran BOOWRI100080475-8.7157115.214OilAnggreko International - rentalIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 135.38
PLTU Tonasa II (Boiler Turbine Generator)WRI100099970-4.7846119.6163CoalPT. Semen Gresik Tbk/PT. Semen IndonesiaIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 380.93
PLTG Keramasan #1 2 3 4WRI100083465-2.9167104.7458GasPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 270.83
Amurang power stationWRI1075799601.1825124.4806Coal2012PLNGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 326.51
DiengWRI100075260-7.2061109.9119GeothermalPT. Geo Dipa EnergyIndonesia Power Generationhttps://repit.wordpress.com/CARMA
Kamojang 4WRI100076560-6.4239107.4553GeothermalPT. Pertamina Geothermal EnergyIndonesia Power Generationhttps://repit.wordpress.com/CARMA
Medan Steel Mill Power PlantWRI1075810603.667698.6654Coal2017PT Gahapi Nisco SteelGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 326.51
PLTU TabalongWRI100098360-2.5213121.357CoalPT. Makmur Sejahtera Wisesa (owned by PT. Adaro)Indonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 326.51
Purwakarta Indorama Power StationWRI107581560-6.5539107.4137Coal2006PT Indorama Synthetics TbkGCPThttps://endcoal.org/global-coal-plant-tracker/GCPT2017: 326.51
Suppa - Pare pareWRI100102060-4.0135119.6255OilPT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power)Indonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 108.3
Bitung - MenadoWRI100074656.621.4451125.1824OilPLN-Nth & Ctrl Sulawesi & Gorontalo Reg UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 102.2
AmpenanWRI100073656.284-8.5667116.0667OilPLN - West Nusa Tenggara Regional Unit/NTBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 101.59
Darajat 1WRI100075055-7.2173107.7394GeothermalPLN – Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/WRI
PLTG CilacapWRI100082255-7.7264109.0094GasPLN – Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 229.17
Wlingi - BrantasWRI100104554-8.0776112.3311HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 158.18; 2014: 138.62; 2015: 149.71; 2016: 161.31; 2017: 165.44
PLTG PriokWRI100084652-6.1071106.8716GasPT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 216.66
Pesanggaran BOTWRI100080551-8.7157115.214OilAnggreko International - rentalIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 92.06
TelloWRI100103150.092-5.14119.4221OilPLN-South&South East Sulawesi Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 90.42
PLTU Embalut - Tanjung BatuWRI100092550-0.5117.15CoalPT. Cahaya Fajar KaltimIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 272.09
SipansihaporasWRI1001018501.742798.7792HydroPLN - North Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 160.65; 2014: 122.7; 2015: 148.67; 2016: 163.59; 2017: 167.37
Pemaron BOOWRI100080245-8.1189115.0887OilPT. Cogindo DayaBersama - rentalIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 81.23
SilaeWRI100101543.7-0.8917119.8707OilPLN-Nth & Ctrl Sulawesi & Gorontalo Reg UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 78.88
Kendari - RentalWRI100077136.31.0591120.798OilPLN - RentalIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 65.52
Tulungagung - BrantasWRI100103836-8.0657111.9025HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 125.46; 2014: 98.39; 2015: 106.37; 2016: 124.04; 2017: 132.82
Minahasa - rentalWRI100079135-1.4789122.3858OilPLN - rentalIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 63.17
Tenau KupangWRI100103334.73-10.1667123.5833OilPLN - East Nusa Tenggara Regional Unit/NTTIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 62.69
PLTU PakerinWRI100096534-2.5213121.357CoalPT. Pakerin (pulp industry)Indonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 185.02
PLTU - Palu - Mpanau - TawaeliWRI100090630-0.8917119.8707CoalPT. Pusaka Jaya Palu PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 163.25
PLTU Bukit AsamWRI100091930-3.7316103.7975CoalPT BA for own useIndonesia Power Generationhttps://repit.wordpress.com/GEODB2017: 163.25
PLTU KupangWRI100094730-2.5213121.357CoalPT. Indonesia Power & electrindo Perkasa UtamaIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 163.25
PLTU RancongWRI100097430-2.5213121.357CoalPT. Jorindo Aceh PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 163.25
Riam Kanan/pangeran Muhamad NurWRI100100430-3.5156115.0074HydroPLNIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 102.63; 2014: 81.56; 2015: 87.65; 2016: 97.75; 2017: 102.52
Sengguruh - BrantasWRI100101029-8.1764112.551HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 99.96; 2014: 68.14; 2015: 80.5; 2016: 104.17; 2017: 99.98
TeginenengWRI100102828.2-5.6015104.7988OilPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 50.9
PLTU SuparmaWRI100098127-2.5213121.357CoalPT. Suparma (pulp industry)Indonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 146.93
Gunung MalangWRI100075825.536-6.7409106.673OilPLN-East Kalimantan Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/WRI2017: 46.09
PLTU KeramasanWRI100094525-2.5213121.357CoalPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 136.04
PLTU TelloWRI100099725-5.14119.4221CoalPLN-South&South East Sulawesi Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 136.04
PLTMG PanaranWRI1000894240.1807101.8444Gasbright PLN BatamIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 100
Mendalan - BrantasWRI100078823-7.854112.3316HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 89.18; 2014: 64.91; 2015: 69.64; 2016: 87.87; 2017: 83.64
PLTG TarakanWRI1000858233.3117.6333GasPT. Cahaya SaktiIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 95.83
Kayu Merah - TernateWRI100076921.0840.8127.4OilPLN - Maluku Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 38.05
Bili biliWRI100074520.1-5.2779119.5817HydroPLNIndonesia Power Generationhttps://repit.wordpress.com/WRI2013: 60.04; 2014: 44.78; 2015: 55.22; 2016: 61.21; 2017: 62.74
Lahendong (Binary Cycle)WRI1000777201.3346124.8392GeothermalBPPT + PertaminaIndonesia Power Generationhttps://repit.wordpress.com/CARMA
PLTG Duri ex PLTG Sunyaragi Cent JavaWRI100082420-7.4064109.5842GasPLNIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 83.33
Lamajan/sagulingWRI100077919.56-6.9039107.6186HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 72.02; 2014: 65.75; 2015: 64.14; 2016: 77.47; 2017: 66.5
Cikalong/sagulingWRI100074719.2-6.9039107.6186HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 70.7; 2014: 65.53; 2015: 63.95; 2016: 76.04; 2017: 65.27
Kracak/sagulingWRI100077618.9-6.9039107.6186HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 69.59; 2014: 64.51; 2015: 62.95; 2016: 74.85; 2017: 64.25
Ubrug/sagulingWRI100103918.36-6.9039107.6186HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 67.6; 2014: 62.66; 2015: 61.15; 2016: 72.72; 2017: 62.42
PLTG (ex PLTD Sunyaragi)WRI100080918-7.4064109.5842GasPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 75
PLTU LatiWRI100094914-2.5213121.357CoalPLN - East Kalimantan Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 76.18
PLTU Pangkalan BunWRI100096614-2.6833111.6167CoalPT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia)Indonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 76.18
PLTU SanggauWRI100097514-2.5213121.357CoalPLNIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 76.18
Talang PadangWRI100102312.5-0.9492100.3543OilPLN-South Sumatera Generation UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 22.56
Timo / MricaWRI100103512-6.9485110.4069HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 36.17; 2014: 27.97; 2015: 34.2; 2016: 37.89; 2017: 37.79
PLTGB SingkawangWRI100086790.9109GasPLT – rented from PT. Krista Inti PersadaIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 37.5
Ketenger / mricaWRI10007728.04-7.5097109.2778HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 33.59; 2014: 25.5; 2015: 29.83; 2016: 35.02; 2017: 32.34
PLTMG Tj. JabungWRI10009048-1.0167104.3667GasPT. Tanjung Jabung PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 33.33
PLTU Tanjung Alam PerkasaWRI10009857.5-2.5213121.357CoalPT. Tanjung Alam PerkasaIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 40.81
Plengan/SagulingWRI10008066.87-6.9039107.6186HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 24.7; 2014: 24.04; 2015: 23.47; 2016: 26.71; 2017: 23.28
Wonorejo - PamekasanWRI10010466.3-8.1136112.2869HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 24.89; 2014: 17.37; 2015: 21.45; 2016: 26.43; 2017: 24.77
PLTU HendratnaWRI10009325-2.5213121.357CoalPT. Hendratna PlywoodIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 27.2
Lodoyo - BrantasWRI10007834.5-8.1613112.2173HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 17.16; 2014: 12.97; 2015: 15.44; 2016: 18.26; 2017: 17.08
Bengkok+Dago/sagulingWRI10007433.85-6.6247107.5564HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 13; 2014: 10.85; 2015: 13.53; 2016: 13.6; 2017: 13.49
Giringan - PamekasanWRI10007553.2-7.7201111.6715HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 6.65; 2014: 6.55; 2015: 7.17; 2016: 7.1; 2017: 7.08
Golang - PamekasanWRI10007562.7-8.1408111.1317HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 9.34; 2014: 6.6; 2015: 8.09; 2016: 9.68; 2017: 9.64
PLTU ListrindoWRI10009502.5-2.5213121.357CoalPT. Listrindo (IPP)Indonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 13.6
Ngebel - PamekasanWRI10007932.2-7.7891111.6167HydroPLN - Java Bali Generation Unit / PT. PJBIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 7.89; 2014: 7.12; 2015: 8.26; 2016: 8.38; 2017: 7.91
PLTGB Tanjung BatuWRI10008682-0.5117.15GasPLN – sewaIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 8.33
PLTMG Pulau BunyuWRI100089823.5117.8333GasPLNIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 8.33
PLTU BilibiliWRI10009182-2.5213121.357CoalPLN-South&South East Sulawesi Regional UnitIndonesia Power Generationhttps://repit.wordpress.com/CARMA2017: 10.88
Pejengkolan/MricaWRI10008011.4-7.5694109.8006HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 2.83; 2014: 2.23; 2015: 2.96; 2016: 3.02; 2017: 3.01
Sidorejo/MricaWRI10010131.4-7.4764110.2622HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 3.78; 2014: 3.83; 2015: 4.47; 2016: 3.98; 2017: 4.23
Klambu/MricaWRI10007731.117-7.0069110.7964HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 3.78; 2014: 3.34; 2015: 3.9; 2016: 3.88; 2017: 3.58
Sempor/MricaWRI10010091-7.4733109.3331HydroPLN - PT. Indonesia PowerIndonesia Power Generationhttps://repit.wordpress.com/CARMA2013: 3.35; 2014: 3.45; 2015: 3.96; 2016: 3.31; 2017: 3.53